London Central Build Blog – Week 11

Week 11 has seen further decommissioning of our Sutton site, along with fantastic developments at our new London Central facility. The offices were properly unpacked this week, allowing the Bermondsey site head quarters to come online. There is still a way to go until they are exactly as we want them (those that know our team will know that we take great pride in making our offices as personal / identifiable as possible), but they are well on their way to becoming our new home.

Further decommissioning of data floor in Sutton

Office layout taking shape

NOC area ahead of deep cleaning

Cardboard recycling pile in reception

Customer Lounge starting to take shape

Customer Lounge starting to take shape

Next week will see our first deep clean, which will bring the facility into a new light after the first stage of works.

London Central Build Blog – Week 10

The 10 week milestone has seen exciting changes to the Bermondsey site, with a refreshed staff kitchen, installation of both the glass partitioning system for the board room and the racking in the ground floor storage area.

Racking system installation

Early population of racking

Installation of new wooden staff kitchen worktops

Worktops after additional oil treatment

Glass partitioning system ready for installation

Base and floor channel installation of glass partitioning system

Header channel installation of glass partitioning system

Partitioning system ready to receive glass panels and doors

A look across the storage area before ceiling works are complete

Customer Lounge flooring reaching completion ahead of furnishing

London Central Build Blog – Week 9

Week 9 has seen some more of the Sutton data centre decommissioned ahead of its closure, as well as the extension of our systems in Docklands. The Docklands facilities we use help form part of our global network, giving us access to carriers and connectivity. By operating our own rack space in other key London locations, we are able to maintain end-to-end control over our systems.

Decoupling racks in Sutton ready for relocating

Core system extensions in Docklands

A look across a section of the Sutton data floor after part-decommissioning

The on-site storage facility at our new data centre has also seen advancements this week, with flooring reaching completion ahead of storage rack assembly.

Floor edging installation in storage area

Floor edging installation in storage area

Flooring in storage lobby completed

Flooring in Customer Lounge being laid

As you can see, this week has seen a division of work across 3 sites, making for a very busy period in terms of physical work and planning / orchestration.

London Central Build Blog – Week 8

This week has seen extensive planning for the data floor works to begin in earnest. There have also been finalisations made to the cabling infrastructure feeding the office, as well as preparation works on the core services room ready for cable runs to begin on the network. Because much of the work at the London Central facility has been hidden from view, there are no worthy progress photos for this week, bar one shot showing the flooring in the large ground floor storage area reaching completion.

Flooring reaching completion in storage area

One area of interest is the secondary team decommissioning the London South (Sutton) facility. The office space has seen a transformation back to its post-refurbished empty state. We took great pride in the building of our Sutton facility, and it is saddening to see it decommissioned, however we are moving on to far bigger and better things in Bermondsey.

Furniture being removed from London South office space

Removal of Netwise Hosting signage from Sutton office

We will have some further pictorial updates for you in the coming weeks.

London Central Build Blog – Week 7

This is a pivotal week for the project, in that migratory planning and preparations will be in full swing alongside build works. Works are now ready to begin on network and power for the data floors, which will see the project enter into it’s second phase – technical engineering.

Custom double-width bookcase for our board room

Lighting system being fitted to board room book case

Lighting being tested before positioning of the unit

Lighting being tested before positioning of the unit

A closer look at our new 50" board room monitors

Flooring reaching completion in the office kitchen

Flooring being laid in ground floor storage facility

Flooring being laid in ground floor storage facility

Flooring being laid in ground floor storage facility

Flooring being laid in ground floor storage facility