London Central Build Blog – Week 15

Our large exterior sign is now almost ready to be installed on the outside of our building. The backing boards are being powder coated for us, after which point the sign will be assembled in it’s final state, wired up and fitted to the outside of our facility. Our team of decorators have been hard at work again this week, completing various areas within the facility ready for installation works to commence, particularly in our Meet Me room.

Test mount of signage letters on unfinished back boards

This sign is over 6.2 meters across and almost 2 meters tall

Completed entrance lobby decoration

Preparing Meet Me room wall for wall cabinets

Unistrut installed ready for wall cabinets

First two 9U wall cabinets are installed and levelled

Finished wall cabinet installation

Cardboard recycling following wall cabinet unboxing

This week has seen some excellent developments in technical areas of the facility. Next week will see the mezzanine floor fire proofed and readied for the running of cable management, as well as structural works in both data halls. Our exterior sign will also be ready for fixing to the side of our building.