London East Build Blog – Week 1 and Introduction

After more than 12 months of planning and preparation, the time to restart our famous Build Blog is finally here.

Many of our readers will probably remember the first iteration of this feature, which we ran throughout the build of our London Central facility, from initial shell to complete data centre.

We’ll be doing exactly the same for this exciting new project, documenting progress as the new data centre takes shape in the coming months.

So here we are, on what is effectively week one of the build project, having taken full control of the new site in early April.


An introduction

While this is week one for the Netwise team and its range of expert contractors, the new site has in fact already undergone a full shell refurbishment and stage one office fit-out, ahead of any project-specific works being undertaken.

These works have seen the complete overhaul of the building to ensure it met our extremely high standards ahead of conversion to a top specification data centre.

This first set of photos show the facility in this completed stage one form; an introduction to the space as we begin conversion this month.

Exterior front elevation
Exterior front elevation, shown from the large front compound
Warehouse 1
A view from the rear of the main warehouse area
Warehouse 2
Another view from back to front in the main warehouse space
Warehouse 3
The main warehouse space, viewed from the front, with the existing amenities block in view
Warehouse 4
A view across the main warehouse space
Reception
A look at the feature staircase in our reception area
Ground Floor
A brief look at some of the existing ground floor amenities
Stairwell
A view up the main stairwell, to the office and future NOC
Office NOC
A view across the office and future NOC area
Another view across the future NOC, to what will eventually become the main screen wall for the NLE engineering team

The blank canvas we’ve been left with following the stage one refurbishment is nothing short of fantastic. We elected to pre-stage this work to ensure no overlap with the main project.

Beyond an illustrative overview of the empty spaces we’re currently presented with for conversion, there naturally isn’t really much to see at this stage. But we do hope that this gives a good early indication of the overall scale and quality of finish being pursued here, something our London Central data centre is already well-known for.


What’s next?

The first couple of weeks will see major transformations in the office area, so that on-site technical operations can begin immediately. We are also onlining a temporary 10Gbps extension to our metro network, connecting the site to our existing fabric to allow for remote monitoring and administrative works on-site to be undertaken without hindrance.

The next primary stage on the heavy construction side will see the installation of the mezzanine and envelope, including walls, ceilings and raised floors, to create the four data hall design in the main warehouse side of the building.

Next week, we will share more information with you regarding technical specifications and drawings, to give a full overview of what to expect from the data centre.

To say that we’re excited is an understatement! We hope this Build Blog can serve as an interesting distraction for everyone in this industry during these difficult times.

We look forward to sharing this journey with you. Keep an eye out for new entries to the Build Blog – subscribe to our RSS feed, YouTube channel and other social platforms for notifications.

Announcing our new London East data centre

Today we are officially announcing plans for the opening of our brand new London data centre, set for launch in 2021.

The state-of-the-art 13,000 square foot facility will be named Netwise London East (NLE), and will join our existing estate of private and partner on-net data centres next year.

A preliminary facility page is now live on our website.

Exterior front elevation
Exterior front elevation

While we’re not releasing a full technical specification just yet, we can say that this will be a 1.5MVA build, housing up to 256 rack footprints across four data halls.

This will be the third private design and build project in our 10 year history, having completed our first small-scale London South build in 2011, and our 11,000 square foot London Central facility in 2016. The new site will interconnect with London Central, as well as primary points of presence across our growing metro network.

We will continue to push focus on hyper-efficient technologies, opting again to deploy an evaporative system for primary cooling, enabling a design capacity PUE as low as 1.05 – one of the lowest for a colocation facility anywhere in the world.

All energy will once again be purchased from entirely renewable sources, to match energy commitments at our existing London Central facility.

This will be inner London’s first new data centre for several years, continuing the trend of capacity growth inside the capital. We are one of just a small collection of independent facility and network operators investing this heavily in the city’s technical infrastructure.

This announcement comes off the back of a 12-month planning and design cycle, which involved several site options and design iterations being put through their paces. It’s incredibly exciting to finally reach the point of publicly announcing London East, and to break ground on what will be a long but very rewarding build phase.

Matthew Butt, Managing Director

London East will give us private coverage over another of London’s key data centre hotspots for the first time. The new facility is just a short distance from the large Telehouse Docklands campus, which stands as one of Europe’s most important interconnection locations.

This will also be our first foray into carrier neutrality, with NLE being the first of our privately-operated colocation facilities to welcome third party network operators into the fold. While clients will still enjoy access to our wide array of connectivity options, they’ll also be able to connect in with their own carriers on-location for the first time.

To say the entire team at Netwise is excited about the new facility is an understatement. Building bespoke data centres is what we do best, and what has enabled us to grow in the way we have, delivering a range of services to our customers that you simply won’t find anywhere else. London East will again take us to the next level in terms of capability and capacity, just as London Central did back in 2016.

Matt Seaton, Senior Manager

We have several key anchor tenants already in early discussions regarding space options at the new site, however details are being kept highly confidential.

We will be resuming our much-lauded Build Blog throughout the course of the project, detailing developments as works progress throughout the year.

Hard hat tours will be available in small numbers each quarter. We advise interested parties to request more information on when these will be available through the ‘Book a Tour’ function on our website.