This week has seen works under way in the electrical intake room, as well as other power-related areas throughout the site.

Glands being fitted to the top of the main generator breaker cabinet

Glands being fitted to the top of the main generator breaker cabinet

A look at some of the copper inside of the main generator breaker cabinet

A look at some of the copper inside of the main generator breaker cabinet

Here we see the generator / backup supply side of the electrical intake room taking shape

Here we see the generator / backup supply side of the electrical intake room taking shape

A look at the internals of the generator breaker cabinet, as the first two gen-sets are terminated

A look at the internals of the generator breaker cabinet, as the first two gen-sets are being terminated

A look at the internals of the generator ATS

A look at the internals of the generator ATS

Current generator feeds as they enter the breaker cabinet

Current generator feeds as they enter the breaker cabinet

Generator control and distribution cabinets reaching completion

External facials of the generator control and distribution cabinets reaching completion

A look at progress on internal cabling

A look at progress on internal cabling

BT circuit now live inside of the meet me room