Cable pulling and system commissioning is now in full swing here at the London Central facility, which is a very exciting time for our entire team. Things are coming together very quickly now, and the data centre will soon have power and connectivity flowing through it as we head into a testing phase shortly thereafter.
![We took delivery of our forklift this week, which will be employed to move heavy equipment around our campus moving forwards - it will be getting a full respray and livery soon](http://blog.netwise.co.uk/wp-content/uploads/2015/02/IMG_2224-300x225.jpg)
We took delivery of our new forklift this week, which will be employed to move heavy equipment around our campus moving forwards – it will be getting a full respray and livery soon
![Final containment bridge in place, linking the first pod with the network backbone which runs across the entire data floor](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_22251-300x225.jpg)
Final containment bridge in place, linking the first pod with the network backbone which runs across the entire data floor
![Custom power distribution enclosures being built on-site](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2237-300x225.jpg)
Custom power distribution enclosures being built on-site
![APC maintenance bypass switch for UPS being fitted with custom fabricated rack ears](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2238-300x225.jpg)
APC maintenance bypass switch for UPS being fitted with custom fabricated rack ears, for fitment into power distribution rack
![Test fitting of APC maintenance bypass switch in power distribution rack](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2239-300x225.jpg)
Test fitting of APC maintenance bypass switch in power distribution rack
![Customised door panel for power distribution enclosure, ahead of assembly](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2240-300x225.jpg)
Customised door panel for power distribution enclosure, ahead of assembly
![Customised door panel for power distribution enclosure, ahead of assembly](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2241-225x300.jpg)
Customised door panel for power distribution enclosure, ahead of assembly
![Power distribution enclosure being fitted with modified and sprayed door panels](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2242-300x225.jpg)
Power distribution enclosure being fitted with modified and sprayed door panels
![IMG_2243](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2243-300x225.jpg)
Power distribution enclosure door panel assembly underway
![Power distribution enclosure door panel assembly completed](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2244-300x225.jpg)
Power distribution enclosure door panel assembly completed
![Custom built internals for power distribution enclosure](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2246-300x225.jpg)
Custom built internals for power distribution enclosure
![Fully assembled power distribution enclosure ahead of internal wiring and final commissioning](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2247-300x225.jpg)
Fully assembled power distribution enclosure ahead of internal wiring and final commissioning
![Containment run in place for cabling to external generators](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2249-300x225.jpg)
Containment run in place for cabling to external generators
![Containment run in place for cabling to external generators](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2251-300x225.jpg)
Containment run in place for cabling to external generators
![External cable ladder system installed to generators](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2253-300x225.jpg)
External cable ladder system being installed on generators
![External cable ladder system being installed on generators](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2254-300x225.jpg)
External cable ladder system being installed on generators
![External cable ladder system joining the generator sets to the facility cladding](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2257-300x225.jpg)
External cable ladder system joining the generator sets to the facility cladding
![Cable basket affixed to generators and cladding](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2258-300x225.jpg)
Cable basket affixed to generators and cladding
![Basket affixed to cladding, ahead of cable exit holes and glands being cut and fitted](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2260-300x225.jpg)
Basket affixed to cladding, ahead of cable exit holes and glands being cut and fitted
![Final cable ladder elements being fitted](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2261-300x225.jpg)
Final cable ladder elements being fitted
![Internal generator containment spine along external cladding, ahead of cable exits being cut into the external facial](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2255-300x225.jpg)
Internal generator containment spine along external cladding, ahead of cable exits being cut into the external facade
![New fire alarm call points being installed throughout the facility](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2250-300x225.jpg)
New fire alarm call points being installed throughout the facility, along with install and commissioning of centralised alarm and VESDA systems
![New fire alarm call points being installed throughout the facility, along with install and commissioning of centralised alarm and VESDA systems](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2263-300x225.jpg)
New fire alarm call points being installed throughout the facility, along with install and commissioning of centralised alarm and VESDA systems
![Ceiling void alarm notification points fitted to data hall ceiling](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2264-300x225.jpg)
Ceiling void alarm notification points fitted to data hall ceiling
![VESDA system and power supply units fitted to data hall entry point](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2262-300x225.jpg)