Again this has been a week of change across various elements of the facility, as we draw near to the stage of initial occupation.
![Air flow signage added to cooler stacks](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2036-300x225.jpg)
Air flow signage added to cooler stacks
![Air flow signage added to cooler stacks](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2038-300x225.jpg)
Air flow signage added to cooler stacks
![Flow controllers in place for cooler stack supplies, which will be controlled by our building management systems](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2089-300x225.jpg)
Flow controllers in place for cooler stack supplies, which will be controlled by our building management systems
![Skirting installed in warehouse / loading bay, ahead of floor coating](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2091-300x225.jpg)
Skirting installed in warehouse / loading bay, ahead of floor coating
![One of our core system racks with UPS and mains bypass switch fitted, along with terminated patch panels](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2097-300x225.jpg)
One of our core system racks with UPS and mains bypass switch fitted, along with terminated patch panels
![Loading bay / warehouse floor coating preparation underway](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2099-300x225.jpg)
Loading bay / warehouse floor coating preparation under way
![Loading bay / warehouse floor coating under way](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2100-300x225.jpg)
Loading bay / warehouse floor coating under way
![Completed floor covering in loading bay / warehouse](http://blog.netwise.co.uk/wp-content/uploads/2014/11/IMG_2135-300x225.jpg)
Completed floor covering in loading bay / warehouse
![Custom cold corridor doors being built and installed](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2112-300x225.jpg)
Custom cold corridor doors being built and installed
![Custom cold corridor doors being fitted](http://blog.netwise.co.uk/wp-content/uploads/2014/11/IMG_2114-300x225.jpg)
Custom cold corridor doors being fitted
![Custom cold corridor doors being fitted](http://blog.netwise.co.uk/wp-content/uploads/2014/11/IMG_2115-300x225.jpg)
Custom cold corridor doors being fitted
![Custom cold corridor doors being fitted](http://blog.netwise.co.uk/wp-content/uploads/2014/11/IMG_2123-300x225.jpg)
Custom cold corridor doors being fitted
![Custom cold corridor doors being fitted](http://blog.netwise.co.uk/wp-content/uploads/2014/11/IMG_2124-300x225.jpg)
Custom cold corridor doors being fitted
![Custom cold corridor doors being fitted](http://blog.netwise.co.uk/wp-content/uploads/2014/11/IMG_2126-300x225.jpg)
Custom cold corridor doors being fitted
![Completed door assemblies for two pods](http://blog.netwise.co.uk/wp-content/uploads/2014/11/IMG_2133-300x225.jpg)
Completed door assemblies for two pods
![New water filter / cooler and coffee machine to cater for visitor tastes](http://blog.netwise.co.uk/wp-content/uploads/2014/12/IMG_2113-300x225.jpg)
New water filter / cooler and coffee machine to cater for visitor tastes