London Central Build Blog – Week 26

Fantastic progress has been made once again this week, across various aspects of the project, from the office through to the core service areas.

Modifications made to meet me enclosures, to alloy for side cable entry

Modifications made to meet me enclosures, to alloy for side cable entry

Template in place for mounting our logo in the office

Template in place for mounting our logo in the office

Holes drilled and plugs inserted

Holes drilled and plugs inserted

Mounting points installed, and logo characters being placed

Mounting points installed, and logo characters being placed

Sign mounted minus the logo tagline

Sign mounted minus the logo tagline

Sign with tagline

Sign with tagline

The completed sign

The completed sign

The temporary divisional wall installed in ground floor data hall, until this area is converted into technical space

The temporary divisional wall installed in ground floor data hall, until this area is converted into technical space

Ground floor lift shaft enclosure reaching completion

Ground floor lift shaft enclosure reaching completion

Channel installed for base of cold corridor enclosure

Channel installed for base of cold corridor enclosure

Top channel supports cut ready for installation

Top channel supports cut and ready for installation

Cold corridor enclosure taking shape, which is to become a complex frame-like structure with various air handling voids, rather than a basic wall

Cold corridor enclosure taking shape, which is to become a complex frame-like structure with various air handling voids, rather than a basic wall

While hard work is most definitely the name of the game when building a world class data centre facility (especially whilst also keeping a large base of existing rack footprints running smoothly), it is safe to say that a break from time to time is welcomed. The entire build team enjoyed a private day of racing at the local Team Sport karting centre this week, which proved to be an incredibly fun afternoon away from the facility.

Our build team members were treated to go karting this week

Our build team members were treated to go karting this week