While structural works are finalised on the ground floor, the first floor data hall is having work done on its floor this week. The bulk of the work is preparative, in anticipation of the epoxy resin finish which will be applied once ready. After this has cured, the final structural works will be completed on the first floor ready for fit out.
![Brushed stand-off sign for reception entrance](http://blog.netwise.co.uk/wp-content/uploads/2014/06/IMG_1178-300x225.jpg)
Brushed stand-off sign for reception entrance
![Fireproofing on the ground floor reaching completion](http://blog.netwise.co.uk/wp-content/uploads/2014/06/IMG_1187-300x225.jpg)
Fireproofing on the ground floor reaching completion
![Beginning of floor filling to hide small gaps and screw holes](http://blog.netwise.co.uk/wp-content/uploads/2014/06/IMG_1176-300x225.jpg)
Beginning of floor filling to hide small gaps and screw holes
![A small area with test / sample resin coat](http://blog.netwise.co.uk/wp-content/uploads/2014/06/IMG_1177-300x225.jpg)
A small area with test / sample resin coat
![Progress being made with floor filling](http://blog.netwise.co.uk/wp-content/uploads/2014/06/IMG_1179-300x225.jpg)
Progress being made with floor filling
![A closer look at joint and screw hole filling ahead of sanding](http://blog.netwise.co.uk/wp-content/uploads/2014/06/IMG_1180-300x225.jpg)
A closer look at joint and screw hole filling ahead of sanding
![First pass sanding reduces joints and removes filler](http://blog.netwise.co.uk/wp-content/uploads/2014/06/IMG_1194-300x225.jpg)
First pass sanding reduces joints and removes filler
![First pass nearing completion](http://blog.netwise.co.uk/wp-content/uploads/2014/06/IMG_11971-300x225.jpg)
First pass nearing completion
![Sanding complete after second pass](http://blog.netwise.co.uk/wp-content/uploads/2014/06/IMG_1202-300x225.jpg)
Sanding complete after second pass