Cabling continues this week, along with completion of final routes around the facility for cable runs. Our Emergency Power Off (EPO) system also took shape this week, which is an added safety feature that will allow the site to be blacked out should there be any major issues requiring a total power off (fire, electric shock etc).
Preparations for network riser between ground floor and first floor
First floor side of network riser completed, awaiting basket protection lid
Cable run holes in meet me room, which feed out to both data floors
Cable run holes in lift shaft, ahead of flexible conduit connections
Emergency Power Off (EPO) system being installed
Emergency Power Off (EPO) system being installed
Emergency Power Off (EPO) system being installed
All elements of the EPO system have been deployed in red
Another EPO junction and control box in the meet me room
Custom red face plates for EPO connection to core UPS units
Red continues all the way to the rear of the UPS, where the final connection is made