Progressions have been made in the ground floor data hall and warehouse areas this week, with the installation of the hung ceiling and the lighting system.

The main lighting conduit installed above the ceiling void

A look at the junction points towards the front of the data hall, with the laser alignment tool in view

VOIP phone and key switch points in ground floor data hall

PIR motion sensors to control zoned lighting system in an ecological fashion

Cabling run into lighting rig conduit

Coiled lighting power cables ready for routing back to power distribution room

A look at the containment installations above ceiling void

A look up the developing lift shaft to the first floor data hall

Construction of shell continues on first floor

Tile installation begins in ground floor ceiling grid

Tile installation begins in ground floor ceiling grid

Tile installation reaching completion